PROJECT DESCRIPTION:

Manufacture 200 assemblies for Tier 1 Automotive Supplier.

 BACKGROUND INFORMATION:

Automotive Supplier failed to watch inventory levels on this assembly and was faced with their customer having to shut down their truck assembly line ; which would have immediate and drastic financial impacts.

 PROJECT TIMELINE:

Started equipment install at ETI FAB on a Monday and have product manufactured in 10 days.

 EQUIPMENT REQUIRED:

160 Ton Stamping Press, 110 Ton Stamping Press, 60 Ton Press Brake, Spot Welder and Chiller Unit

RESULTS:

200 pieces boxed and ready to go on day 7 @ 10:30am

 Jeff Frazee Quote:

“I’d like to personally share a huge shout out to the team that went above and beyond normal duties to ensure that our new customer was not faced with an automotive assembly line shut down. The ETI Fab team worked closely together to find solutions to the mountain of obstacles encountered during this mission while showing our customer that we are a very strong partner for future projects.” (Jeff Frazee – Plant Manager)